Balm | Vianen

Balm | Vianen

Visiting address

Eendrachtsweg 9
4131 NS Vianen

Plan your route

Balm, part of the SealteQ Group since July 2025, has been a trusted specialist in concrete renovation and repair for over 50 years. From Vianen, Balm delivers sustainable and high-quality solutions, supported by craftsmanship, reliability, and customer focus.

Balm | Vianen foto 1
Balm | Vianen foto 2
Balm | Vianen foto 3
Swiper navigation right
Swiper navigation left

Contact us

This field is for validation purposes and should be left unchanged.
Bestanden kunt u hier uploaden ter ondersteuning van uw aanvraag (optioneel).
Drop files here or
Max. file size: 128 MB.

    About Balm

    Balm has been active in concrete renovation and repair for over 50 years. Long before the term ‘concrete deterioration’ was used in the Netherlands, the company was already repairing damage to concrete structures. Since July 2025, Balm has been part of the SealteQ Group.

    Specialist in concrete renovation

    As a certified concrete repair company, Balm strengthens, repairs, and protects concrete structures of various sizes. The company operates in residential construction, commercial construction, civil engineering, and works for both business clients and private individuals.

    Future-oriented

    With years of experience, specialized knowledge, and a practical approach, Balm seamlessly aligns with SealteQ’s core values: craftsmanship, reliability, and customer focus.

    Read more about the acquisition:

    Projects

    View our recently completed projects

    Concrete repair of monumental bunker in Hoek van Holland
    Major maintenance on the Juliana lock complex in Gouda
    Maintenance work on the Tweede Rijksbrug Sittard
    Concrete repair Cooling tower Geertruidenberg
    Work on the Hofgarage and Werfgarage in Amsterdam
    Concrete protection bridge at Camping Balvert Nieuwkoop
    Concrete renovation of pylon foundations for the Goor-Hengelo high-voltage power line
    Swiper navigation right
    Swiper navigation left

    Concrete repair of monumental bunker in Hoek van Holland

    Bunker iCOON on Badweg in Hoek van Holland is a monumental structure dating from the Second World War. Today, it houses the iCOON museum of modern art. Balm, part of the SealteQ Group, is responsible for repairing the concrete and restoring the monument to its original condition as much as possible.

    Major maintenance on the Juliana lock complex in Gouda

    The Juliana lock complex is a group of locks, bridges and associated structures on the Gouwe and Hollandse IJssel rivers in Gouda. The complex connects important waterways and also forms a transport hub, with the N207 provincial road running over it, among other things. The Juliana lock, built between 1932 and 1936, is a listed building.

    Maintenance work on the Tweede Rijksbrug Sittard

    The Second Rijksbrug in Sittard is a vital link in the Dutch rail network. The bridge on Doctor Nolenslaan carries daily rail traffic whilst allowing road traffic to pass underneath. It is a structure that is under constant strain and requires regular maintenance.

    Concrete repair Cooling tower Geertruidenberg

    Balm carried out concrete repair work at a great height (120 m) on the cooling tower in Geertruidenberg. Due to the thin concrete cover, the concrete on the surface was damaged, which weakened the structure and could pose safety risks.

    Work on the Hofgarage and Werfgarage in Amsterdam

    The Hofgarage and the Werfgarage, two car parks on the outskirts of the Kattenburg district in Amsterdam, date from 1975. Given their age and the need for modernisation, Balm carried out an extensive refurbishment of both buildings, addressing the structural, architectural and technical aspects of both the interior and exterior.

    Concrete protection bridge at Camping Balvert Nieuwkoop

    Camping Balvert, located on the Meije river in the middle of the Nieuwkoopse Plassen area, is accessible via a concrete bridge. This bridge was in need of maintenance and has recently undergone renovation.

    Concrete renovation of pylon foundations for the Goor-Hengelo high-voltage power line

    Commissioned by TenneT, Balm carried out concrete renovation work on the pylon foundations of the 380 kV high-voltage power line between Goor and Hengelo. In total, this involved the foundations (piles) of 35 high-voltage pylons.

    Curious how we can further assist you with your project?

    © Copyright SealteQ 2026 Gebouwd door Saam' Marketing uit Groningen