The content of this page has been translated automatically and may contain minor errors.
Concrete repair Cooling tower Geertruidenberg

Concrete repair Cooling tower Geertruidenberg

View the project here

Balm carried out concrete repair work at a great height (120 m) on the cooling tower in Geertruidenberg. Due to the thin concrete cover, the concrete on the surface was damaged, which weakened the structure and could pose safety risks.

The concrete repair project was carried out in two phases so that the work at great heights could be carried out in a clear and safe manner. This phased approach allowed Balm to carefully plan and execute the complex work, with constant attention to structural strength and service life.

The restoration was carried out with precision and craftsmanship to fully reinforce and sustainably protect the tower, with special attention to the challenges of working at height.

The result: a robust, future-proof cooling tower in which safety and sustainability are guaranteed.

Specialties

Sustainable anti-slip floor coating for the food industry
View the next project

Sustainable anti-slip floor coating for the food industry

SealteQ applied a durable epoxy anti-slip coating system to a surface area of 2,500 m². The aim of the project was to create a floor that could withstand intensive use in a commercial environment.

Curious how we can further assist you with your project?

© Copyright SealteQ 2026 Gebouwd door Saam' Marketing uit Groningen