SealteQ Ivacon renovates residential area and installs energy-saving measures

SealteQ Ivacon renovates residential area and installs energy-saving measures

SealteQ Ivacon carried out renovation work in a residential area located at Tjepmahof and Rijnesteinhof in Utrecht. The site comprises a residential area consisting of various types of apartment complexes and single-family housing blocks.

Overall Renovation and Energy-Saving Measures

The project was divided into 4 phases and executed on behalf of Koopmans Bouw BV from Enschede. The entire district required renovation, and energy-saving measures had to be implemented for all residences. Various elements needed insulation, which included raising and insulating the balconies. In collaboration with Koopmans’ contractors, a detailed schedule was developed to determine when specific balconies and galleries could be addressed. Throughout the project, a standard team of two employees was deployed, which could be expanded to two teams during favorable weather conditions. The efficient execution quickly led to a streamlined schedule. All parties involved had clear visibility of their tasks and timelines, enabling them to complete the project seamlessly and collaboratively.

The work carried out by SealteQ consisted of:

  • Concrete repairs to the balconies, galleries, stairs, and concrete curbs.
  • Applying a waterproof and crack-bridging Triflex BFS system to balconies without a residence underneath.
  • Insulating balconies with residences underneath using the Triflex BIS system, followed by the application of the Triflex BFS system.
  • Applying a Triflex BFS system to all galleries and stairs.
  • Broadcasting colored granucol onto the Triflex system, in black and grey.
  • Providing stairwell entrances in various ground-floor apartment complexes with a new floor finish.

Phases 1 and 2 were completed two and approximately one year ago, respectively. SealteQ is currently working on the final galleries and single-family housing blocks within phases 3 and 4. The work is expected to be completed in the upcoming spring.

SealteQ West applies 17,000m2 floor coating in warehouse
View the next project

SealteQ West applies 17,000m2 floor coating in warehouse

On behalf of HB Capital, the floors of halls 4 and 5 of a distribution center are being fitted with a heavy-duty industrial poured flooring system from BASF.

Curious how we can further assist you with your project?