The ‘t Vlasmeer Swimming Pool Foundation has awarded us the contract to extensively renovate the swimming pool in Onstwedde, ensuring it is prepared for the future.
Currently, our specialists are fully engaged in Onstwedde. They first removed the existing coating from the two pools and the footbaths. Subsequently, they also removed the old tile edges from the overflow rims of both pools. The overflow channels will be dismantled and then restored. Furthermore, they are replacing all expansion joints in both swimming pools. Finally, we will apply a new coating system (1293 m2), which will make the swimming pool as good as new.