New coating system for gallery flat in Spijkenisse

New coating system for gallery flat in Spijkenisse

This month, our specialists from SealteQ Ivacon were also working in Spijkenisse. There, they worked on the galleries and landings of an apartment building at Staringplantsoen.

The existing coating on these floors and landings showed signs of wear. Without proper protective coating, weather conditions can damage the concrete structure. In some areas, initial concrete damage was already visible. To prevent further damage, we applied a new coating system to the floors and landings.

First, we removed the existing coating and repaired irregularities in the substrate. Then we applied a primer layer for optimal adhesion. Subsequently, we applied the self-leveling floor and created a drainage channel to reduce water retention on the walking surface. Finally, we applied a colored top coat with sufficient anti-slip properties.

We also paid special attention to the railing balusters cast into the concrete structure. These were experiencing water infiltration. To prevent this from recurring in the future, we seamlessly incorporated them into the coating system using reinforcement fabric.

Cathodic protection of Heek garage Enschede
View the next project

Cathodic protection of Heek garage Enschede

In the southern part of Enschede, you can park in the largest underground parking garage in the Netherlands, the Van Heekgarage. This garage, located beneath Van Heekplein, accommodates 1700 cars and is open 24 hours a day, 7 days a week. Enschede's shopping district can be found on and around Van Heekplein.

Curious how we can further assist you with your project?

© Copyright SealteQ 2026 Gebouwd door Saam' Marketing uit Groningen