In the recent period, we have been working on three parking garages on Fregelaan in Amsterdam. We have resolved water leakages, performed concrete repairs, and provided the ramps with a new wear layer. First, we addressed the leaks caused by the overhead roof gardens and walkways. We did this by incorporating all connections and details with a waterproof membrane. This involved the connection between the roof garden and the upstand, the joints of the coping stones, and the joints of the walkways and stairs.

Subsequently, we carried out various concrete repairs in the garages themselves, including at the junction of the wall and floor. We also provided this junction with a 2-layer bitumen seal with reinforcing fleece as extra protection to prevent future leaks. We sealed the leaking penetrations in the concrete walls by applying StopaQ around the pipes and finishing with mortar. There was also cracking in the basement floor. This was injected under low pressure using our special 2-component injection technique. As a result, the basement is waterproof again, and the reinforcement can no longer be affected by moisture ingress.

Ramps

Finally, we addressed the ramps. To minimize inconvenience for the parking garage users, we provided them with a quick-drying anti-slip poured flooring system. After pre-treating the substrate, a poured layer was applied. This was sprinkled with basalt chippings and then transparently sealed. The edge details were also included in the waterproof system. After painting the concrete retaining walls of the ramps, a beautiful whole has been created, and the concrete structures are once again sustainably protected.

Conservation work at Urker Lock
View the next project

Conservation work at Urker Lock

At the end of 2019, the combination of Croonwolter&dros and Hollandia Services began renovating all provincial locks and movable bridges on behalf of the Province of Flevoland. SealteQ is carrying out the conservation work on the various objects for the 'Major Maintenance of Bridges and Locks' program on behalf of the contractor combination. One of the objects SealteQ is conserving is the Urkersluis. After the completion of the conservation work, the Urkersluis will be ready for years to come.

Curious how we can further assist you with your project?

© Copyright SealteQ 2026 Gebouwd door Saam' Marketing uit Groningen