During inspections, damage to the concrete was identified: loose sections of concrete, cracking and corroded reinforcement. Following an analysis of the damage mechanisms, a repair plan was drawn up, and SealteQ carried out the repairs to a high standard.
The approach consisted of several steps. First, the damaged areas were exposed and loose parts removed. The reinforcement was derusted, treated against corrosion and replenished where necessary. Shotcrete was then applied, creating a strong and durable bond with the existing concrete. Additional reinforcement was added at critical points to strengthen the structural integrity of the repairs.
The discharge pipe is now once again able to withstand strong water currents, the effects of the weather and the salty environment. This has significantly extended its service life.