On behalf of HB Capital, the floors of halls 4 and 5 of a distribution center are being fitted with a heavy-duty industrial poured flooring system from BASF.
On behalf of HB Capital, the floors of halls 4 and 5 of a distribution center are being fitted with a heavy-duty industrial poured flooring system from BASF.
Due to an extensive reorganization and rearrangement of the various halls of the DC in Mijdrecht, the floors of halls 4 and 5 require drastic intervention. This substantial renovation is necessary due to damage to the substrate and dust formation caused by the existing asphalt floors.
The total floor area is approximately 17,000 m² and will be completely treated in 4 phases, with two floors per phase over a period of 6 weeks.
The main activities consist of:
After curing of this system, the floors are equipped with a wear-resistant and easily cleanable polyurethane poured layer. This allows the new user to make optimal use of the warehouse.
SealteQ Ivacon carried out renovation work in a residential area located at Tjepmahof and Rijnesteinhof in Utrecht. The site comprises a residential area consisting of various types of apartment complexes and single-family housing blocks.