This parking garage has rust on the sprinkler pipes. Our task is to remove rust from those 8,700 meters of sprinkler piping and then apply coating. Additionally, 2,675 sprinkler heads will be replaced (executed by SPIE Nederland). We perform the rust removal and coating in multiple phases so that the parking garage can continue to be used during the work. We systematically take sections of the sprinkler system out of service and ensure that traffic is properly redirected.
Part of the parking garage essentially floats above the Kralingse Zoom metro station. We are completely replacing the sprinkler system in that section with a new one. This requires considerable preparation (permit applications, creating specific work plans and Task Risk Analyses) and extra attention to safety because we are working above the railway tracks.