Commissioned by TenneT, Balm carried out concrete renovation work on the pylon foundations of the 380 kV high-voltage power line between Goor and Hengelo. In total, this involved the foundations (piles) of 35 high-voltage pylons.
Commissioned by TenneT, Balm carried out concrete renovation work on the pylon foundations of the 380 kV high-voltage power line between Goor and Hengelo. In total, this involved the foundations (piles) of 35 high-voltage pylons.
The work involved excavating four concrete foundations around each mast to a depth of approximately 50 cm, sanding and cleaning the concrete, and repairing and levelling it where necessary. A primer coat was then applied, followed by a two-coat coating system. The steel bases on the foundations were sanded and treated with a two- to three-coat component paint. Finally, the ground around the footings was backfilled.