Last year, we had the opportunity to carry out a special project for the TriAX consortium: the largest steel bridge that SealteQ has ever treated in its workshop. With a width of 18 meters and a length of 35 meters, including the ballast box, this bridge was completely blasted, coated, and provided with a wear layer.

The construction is finished with a carefully constructed multi-layer coating system, which ensures optimal corrosion protection, wear resistance, and a durable, representative appearance.

The work is part of the large-scale infrastructure project for the A10 South at the De Nieuwe Meer junction, carried out by the TriAX consortium. The project includes the construction and improvement of viaducts and bridges, with the aim of improving traffic flow and safety in this busy section of the ring road around Amsterdam.

With our expertise, we ensure that this essential infrastructure is sustainably protected and representatively implemented, ready for years of intensive use.

Kronenburg bus station equipped with sustainable coating system
View the next project

Kronenburg bus station equipped with sustainable coating system

SealteQ has applied a durable coating system to the steel structure of the roof and columns at the renovated Kronenburg bus station in Arnhem. The bus station, located on Burgemeester Matsersingel, is the first completed project in the large-scale redevelopment of the Kronenburg district in Arnhem-Zuid.

Curious how we can further assist you with your project?

© Copyright SealteQ 2026 Gebouwd door Saam' Marketing uit Groningen