At Wiardi Beckmanstraat and J. Poststraat, the ‘sister flats’ are undergoing major maintenance, which includes:
- Concrete repairs and conservation of ceilings and thickness edges, to ensure the structural integrity of the balconies and prevent future damage.
- Post-insulation of masonry, to increase energy efficiency and improve living comfort for the residents.
- Sealing work, for a water- and airtight finish.
- Balcony finishes with a reinforced PMMA system, a durable and low-maintenance coating that provides long-term protection against weather influences and wear.
For the complex at J. Poststraat, an additional follow-up order has already been received to address the gallery side of the flats in 2026, after the completion of a sustainability project.
By applying concrete repair, insulation, and high-quality finishing techniques, the balconies are fully restored and made suitable for long-term use. The work enhances the sustainability of the buildings and ensures the safety and comfort for the residents.