On behalf of KBK MediZorg, the specialists from SealteQ Ivacon (Amsterdam) have reinforced a concrete floor in the VU medical center.
On behalf of KBK MediZorg, the specialists from SealteQ Ivacon (Amsterdam) have reinforced a concrete floor in the VU medical center.
We reinforced this floor by applying carbon fiber reinforcement. For every intervention where carbon fiber reinforcement is applied, a structural engineer makes a calculation in advance. This was also the case here. After making the structural calculations, we pre-treated the surface by diamond grinding. Subsequently, we performed adhesion strength measurements and finally bonded the carbon fiber strips with epoxy.
In total, we applied 22 carbon fiber strips with a total length of 160 meters.
Over the weekend of 24, 25 and 26 February, Combinatie Herepoort carried out maintenance works on the longitudinal joint of a section of the temporary ring road. As part of these works, the underlying foundation and reinforced soil structure were stabilised using injection techniques.