In 2018, SealteQ innovatively renovated the South Pier in Kralendijk, Bonaire on behalf of Bouwcombinatie Bonaire. The pier had deteriorated heavily over the years due to the salty climate (corrosion of reinforcement). As a result of SealteQ’s life-extending maintenance measures, the pier was completely renovated. This was the first project on which large-scale glass and carbon adhesive reinforcement was applied, with a beautiful end result. Glass and carbon reinforcement are insensitive in terms of corrosion due to the salty environment. As a result of this work, the life span of the pier was extended for a period of 30 – 40 years.
